Jump to content
JChartFX Community

renish patel

Members
  • Posts

    1
  • Joined

  • Last visited

Posts posted by renish patel

  1. Here is my code please look into this and suggent me what i changed for it..Here i getting more than one chart means when i change start date as well as end date..Thanks in advance 
     
    <asp:Content ID="Content1" ContentPlaceHolderID="head" runat="Server">
        <link rel="stylesheet" type="text/css" href="Styles/jchartfx.css" />
        <link href="Styles/datepicker.css" rel="stylesheet" type="text/css" />
        <script type="text/javascript" src="Scripts/jchartfx.system.js"></script>
        <script type="text/javascript" src="Scripts/jchartfx.coreBasic.js"></script>
        <script src="Scripts/jchartfx.animation.js" type="text/javascript"></script>
        <script src="Scripts/jquery-2.0.3.min.js" type="text/javascript"></script>
        <script src="Scripts/bootstrap-datepicker.js" type="text/javascript"></script>
    </asp:Content>
    <asp:Content ID="Content2" ContentPlaceHolderID="ContentPlaceHolder1" runat="Server">
        <div class="input-append date" id="dp1" style="width: 200px; height: 100px; float: right;
            margin-top: 60px; margin-left: 200px; display: inline-block">
            End Date:
            <input class="span1" size="16" type="text" id="end" runat="server" />
            <span class="add-on"><i class="icon-calendar"></i></span>
        </div>
        <div class="input-append date" id="dp2" style="width: 200px; height: 100px; float: right;
            margin-top: 60px; margin-left: 100px; display: inline-block">
            Start Date:
            <input class="span2" size="16" type="text" id="start" runat="server" />
            <span class="add-on"><i class="icon-calendar"></i></span>
        </div>
        <div id="ChartDiv" style="width: 400px; height: 200px; padding-top: 100px; display: inline-block">
        </div>
        <script type="text/javascript" lang="javascript">

            var chart1;
            chart1 = new cfx.Chart();
            var startDate;
            var endDate;


            $('#dp2').datepicker().on('changeDate', function (ev) {
                chart1.doUpdate(true);
                loadChart();
            });

            $('#dp1').datepicker().on('changeDate', function (ev) {
                chart1.doUpdate(true);                  
                loadChart();
            });


            function loadChart() {

                
                chart1.getAnimations().getLoad().setEnabled(true);
                chart1.setGallery(cfx.Gallery.Pie);

                var startDate = $("#dp2 input").val();
                var endDate = $("#dp1 input").val();          

                $.ajax({
                    type: "POST",
                    url: ("Default2.aspx/GetData"),
                    data: "{startDate:'" + startDate + "',endDate:'" + endDate + "'}",
                    contentType: "application/json; charset=utf-8",
                    dataType: "json",
                    success: function (result) {

                        var data = $.parseJSON(result.d);
                        chart1.setDataSource(data);
                        var divHolder = document.getElementById('ChartDiv');
                        chart1.create(divHolder);

                    },
                    error: function (xhr, txt, err) {
                        alert("error connecting to data: " + txt);
                    }
                });
            }
            
        </script>
    </asp:Content>

    post-2107-13939743542994_thumb.jpg

×
×
  • Create New...